Saturday, September 19, 2026
Tourism

Saudi Water Authority Activates First Pump at Jamoum for Hajj Season 1445

Saudi Water Authority Activates First Pump at Jamoum for Hajj Season 1445

The Saudi Water Authority (SWA) has announced the successful operation of the first pump at the second pumping station in Jamoum Governorate, Makkah Region, coinciding with the start of the Hajj season 1445 H. The milestone is part of the Rabigh-Jeddah-Makkah water transportation system, a strategic project executed by the Water Transport and Technology Company (WTTC) to ensure adequate water supply to the Makkah Region and its governorates. The system is designed to meet the high water demand during the Hajj pilgrimage, reflecting the Kingdom’s commitment to serving pilgrims and ensuring their comfort.

Context and Background

The Rabigh-Jeddah-Makkah water transportation system is a key infrastructure project that spans a 650-km-long pipeline with a total value exceeding SAR4 billion. It is part of Saudi Arabia’s broader efforts to enhance water security and support the needs of the Makkah Region, particularly during the Hajj season when millions of pilgrims gather. The project aligns with the directives of the Saudi leadership to provide the highest level of services to pilgrims, ensuring they can perform their rituals with peace of mind.

The SWA, in collaboration with WTTC, has been working diligently to prepare the operational water system, which includes production, transportation, storage, and distribution. This preparation is crucial to meet the increased water demand during Hajj and to maintain the efficiency and reliability of water services across the region.

Key Details

The operation of the first pump at the second pumping station in Jamoum Governorate marks a significant step in ensuring a steady water supply. WTTC is ready to supply the Makkah Region with up to 1.3 million cubic meters per day. The system includes dip tanks with a storage capacity exceeding one million cubic meters. The pumping stations have been upgraded to operate at 125% of their design pumping capacity, and storage quantities have reached 98% of the design storage capacity. These measures are part of comprehensive business continuity plans implemented with high efficiency to meet the needs of pilgrims.

The SWA has announced complete readiness of the operational water system, emphasizing its role in improving services during the Hajj season 1445 H. This readiness is a testament to the Kingdom’s dedication to serving pilgrims and ensuring their well-being.

Implications and Impact

The successful operation of the Jamoum pumping station has significant implications for water management during Hajj. It ensures a reliable water supply to the Makkah Region, which is essential for the health and comfort of pilgrims. The increased pumping and storage capacities demonstrate the Kingdom’s ability to handle large-scale logistical challenges. This project also underscores Saudi Arabia’s commitment to investing in critical infrastructure that supports both religious and civilian needs.

Furthermore, the efficiency gains in the water system contribute to the overall success of the Hajj season, enhancing the experience for pilgrims and reinforcing the Kingdom’s reputation for excellent hospitality and service. The project’s alignment with Vision 2030 goals of sustainable development and improved quality of life is evident in its focus on resource optimization and infrastructure modernization.

Vision 2030 Alignment

The Rabigh-Jeddah-Makkah water transportation system is a prime example of how Saudi Arabia is advancing its Vision 2030 objectives. By investing in state-of-the-art water infrastructure, the Kingdom is not only meeting the immediate needs of Hajj but also building a sustainable future where water resources are managed efficiently. This project reflects the Vision’s pillars of a vibrant society, a thriving economy, and an ambitious nation. It showcases Saudi Arabia’s ability to leverage innovation and technology to serve its people and guests, ensuring that the Hajj experience is safe, comfortable, and spiritually fulfilling. As the Kingdom continues to welcome millions of pilgrims annually, such projects will remain central to its strategy of enhancing service quality and achieving global leadership in water management.

20 Questions

Q1. What did the Saudi Water Authority announce regarding Jamoum Governorate?

A1. The Saudi Water Authority announced the operation of the first pump at the second pumping station in Jamoum Governorate, Makkah Region, coinciding with the start of the Hajj season 1445 H. This is part of the Rabigh-Jeddah-Makkah water transportation system.

Q2. Which company operates the pumping station in Jamoum?

A2. The Water Transport and Technology Company (WTTC) operates the pumping station. WTTC is responsible for ensuring the water supply to the Makkah Region during Hajj and beyond, as part of the strategic water transportation system.

Q3. What is the length of the pipeline in the Rabigh-Jeddah-Makkah water transportation system?

A3. The pipeline is 650 kilometers long. It is a major infrastructure project designed to transport water from Rabigh to Jeddah and Makkah, ensuring adequate supply to the region, especially during peak demand periods like Hajj.

Q4. What is the total value of the Rabigh-Jeddah-Makkah water transportation project?

A4. The project’s value exceeds SAR4 billion. This significant investment reflects the Kingdom’s commitment to enhancing water security and infrastructure to serve both residents and pilgrims in the Makkah Region.

Q5. How much water can WTTC supply to the Makkah Region daily?

A5. WTTC is ready to supply up to 1.3 million cubic meters of water per day to the Makkah Region. This capacity ensures that the needs of pilgrims and residents are met during the Hajj season.

Q6. What is the storage capacity of the dip tanks in the system?

A6. The dip tanks have a storage capacity exceeding one million cubic meters. This large storage capacity helps maintain a steady water supply and ensures availability during high-demand periods.

Q7. What percentage of the design pumping capacity have the pumping stations achieved?

A7. The pumping stations have increased their efficiency to 125% of the design pumping capacity. This enhancement allows for greater water flow and ensures that the system can handle the increased demand during Hajj.

Q8. What percentage of the design storage capacity has been achieved?

A8. The storage quantities have reached 98% of the design storage capacity. This near-full capacity demonstrates the system’s readiness to meet the water needs of the Makkah Region during the Hajj season.

Q9. What did the SWA announce regarding the operational water system?

A9. The SWA announced complete readiness of the operational water system, which includes production, transportation, storage, and distribution. This readiness is aimed at keeping pace with the water needs and improving services during the Hajj season 1445 H.

Q10. Why is the Jamoum pumping station important for the Hajj season?

A10. The Jamoum pumping station is crucial because it helps ensure a reliable water supply to the Makkah Region during Hajj, when millions of pilgrims require water. It supports the overall efficiency of the water transportation system.

Q11. What are the business continuity plans implemented by WTTC?

A11. WTTC has implemented business continuity plans with high efficiency to ensure uninterrupted water supply. These plans include maintaining high pumping and storage capacities to meet the needs of pilgrims during Hajj.

Q12. How does the project align with the directives of the Saudi leadership?

A12. The project aligns with the Saudi leadership’s directives to make all efforts to serve pilgrims and ensure they perform their rituals with peace of mind. It reflects the Kingdom’s commitment to prioritizing the comfort and well-being of guests.

Q13. What is the significance of the Rabigh-Jeddah-Makkah water transportation system?

A13. The system is significant because it ensures adequate water supply to the Makkah Region, supporting both residential and pilgrimage needs. It is a key infrastructure project that enhances water security and demonstrates Saudi Arabia’s advanced capabilities.

Q14. How does the water system contribute to the overall Hajj experience?

A14. The water system provides a reliable and sufficient water supply, which is essential for the health and comfort of pilgrims. It allows pilgrims to focus on their spiritual journey without concerns about water availability.

Q15. What role does the SWA play in the water system?

A15. The SWA supervises and ensures the readiness of the operational water system. It oversees production, transportation, storage, and distribution to meet the water needs during Hajj and throughout the year.

Q16. How does the project reflect Saudi Arabia’s Vision 2030?

A16. The project reflects Vision 2030 by investing in sustainable infrastructure, enhancing quality of life, and improving services for pilgrims. It showcases the Kingdom’s commitment to innovation and efficient resource management.

Q17. What are the dip tanks used for in the water system?

A17. Dip tanks are used for water storage. They have a capacity exceeding one million cubic meters, ensuring a reserve supply to meet demand fluctuations and maintain consistent water availability during Hajj.

Q18. How many pilgrims are expected during Hajj season 1445 H?

A18. The article does not specify the number of pilgrims, but the system is designed to meet the needs of millions. The preparations indicate a high number, requiring robust water infrastructure and planning.

Q19. What improvements have been made to the pumping stations?

A19. The pumping stations have been upgraded to operate at 125% of their design pumping capacity. This improvement increases water flow and ensures the system can handle the high demand during Hajj.

Q20. What is the expected impact of the project on the Makkah Region?

A20. The project will ensure a reliable water supply, supporting the needs of pilgrims and residents. It enhances the region’s infrastructure, contributing to a smoother Hajj experience and aligning with long-term development goals.


Reader Feedback

We value your thoughts. Please share your feedback on this article.

Your feedback helps us improve our coverage.